FAQ

Do I need a Planning Permit?

Each job is address specific. A phone call to your local council with your address will answer this question. Not all jobs require a Planning Permit.

What if I want to get my own permit?

We are able to give you all the paperwork you require to obtain your own permit. We can print out the job specific engineering drawings for each job within 15 mins.

Do I have to get a Building Permit?

Every shed over 20m2 needs to have a Building Permit. We can assist with the council process.

Do I have to put the concrete down first or can we pour it in after?

Our preferred method of construction is slab first. BlueScope Steel will void their warranty if any part of the wall sheeting is used for formwork. For this reason we have the slab poured first, the building will then be erected.